IRISH BUILDING REGULATIONS (TGD) & SAFETY COMPLIANCE

Safety and legal compliance are engineered into every partition and door system we manufacture:

Architectural Note for Site Managers: Measuring an un-plastered ope or unconfirmed floor level compromises the tight 2mm manufacturing tolerances required for bespoke steel door systems. Complete wall finishes prior to scheduling your Leica 3D survey.

WHAT TO EXPECT: THE PROCESS

1 - Ope Preparation & Subfloor Detail

Before final production measurement, your “ope“ (the finished wall opening) must be completely rendered, skimmed and plastered. While flooring does not have to be laid, your exact floor type and finished depth (millimeters) must be specified to ensure seamless threshold clearance.

2 - 3D Leica Laser Survey & CAD Drafting

We do not rely on manual tape measure estimates. Our team conducts on-site 3D spatial scans using the Leica iCON iCs50 robotic construction sensor. Captured data feeds directly into our CAD software to generate precise production drawings.

3 - Precise Steel Fabrication

Every steel frame and glass panel is custom built in our workshop. Manufacturing lead times are typically 8 weeks, commencing upon client sign-off of final production drawings and receipt of the 50% deposit.

4 - White-Glove Installation

Our in-house master fitters arrive in our Glass Walls and Doors fleet. Equipped with dedicated floor coverings and HEPA-filtered vacuum systems, our team ensures a dust-free, white-glove installation with zero disruption to your property.